IAC logo
IAC Assessment: SF0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Rasins
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $1,000,000-$5,000,000
# of Employees 49
Plant Area (Sq.Ft.) 12,608
Annual Production 30,000 Tons
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,676 2,167,137 kWh $0.09
Electricity Demand $92,958 6,741 kW-months/year $13.79
Electricity Fees $15,643 - $ -
Natural Gas $425,250 93,241 MMBtu $4.56
TOTAL ENERGY COSTS $730,527
RECOMMENDED SAVINGS* $70,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,435
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8112 COMBINE UTILITY METERS Savings:
$27,096
Cost:
$10,000
- - - - $27,096 - - - -
-
kWh
-
-
kW-months/year
$27,096
-
$
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$936
Cost:
$380
- - - - - - $936 102 -
-
kWh
-
-
kW-months/year
-
-
$
$936
102
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,032
Cost:
$1,872
- - - - - - $1,032 112 -
-
kWh
-
-
kW-months/year
-
-
$
$1,032
112
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$380
Cost:
$2,139
$219 2,483 $161 12 - - - - $219
2,483
kWh
$161
12
kW-months/year
-
-
$
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$256
Cost:
$684
- - - - - - $256 53 -
-
kWh
-
-
kW-months/year
-
-
$
$256
53
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$40,499
Cost:
$409,247
$34,473 390,846 $6,026 436 - - - - $34,473
390,846
kWh
$6,026
436
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$70,199
Cost:
$424,322
$34,692 393,329 $6,187 448 $27,096 - $2,224 267 $34,692
393,329
kWh
$6,187
448
kW-months/year
$27,096
-
$
$2,224
267
MMBtu
TOTAL IMPLEMENTED Savings:
$41,435
Cost:
$409,627
$34,473 390,846 $6,026 436 - - $936 102 $34,473
390,846
kWh
$6,026
436
kW-months/year
-
-
$
$936
102
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas