IAC Assessment: SF0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Treated Sewage
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 35
Plant Area (Sq.Ft.) 620,000
Annual Production 6,205,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,264,134 15,636,290 kWh $0.08
Electricity Demand $682,593 36,660 kW-months/year $18.62
Electricity Fees $30,062 - $ -
TOTAL ENERGY COSTS $1,976,789
RECOMMENDED SAVINGS* $294,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131,728
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,448
Cost:
-
$6,448 79,509 - - $6,448
79,509
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$923
Cost:
-
$923 27,684 - - $923
27,684
kWh
-
-
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$915
Cost:
-
$700 8,629 $215 12 $700
8,629
kWh
$215
12
kW-months/year
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,223
Cost:
$382
$589 7,266 $634 36 $589
7,266
kWh
$634
36
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,314
Cost:
$38,630
$17,370 214,602 $7,944 431 $17,370
214,602
kWh
$7,944
431
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$85,494
Cost:
$200,504
$65,162 804,416 $20,332 1,129 $65,162
804,416
kWh
$20,332
1,129
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$39,049
Cost:
$165,422
$29,759 367,372 $9,290 516 $29,759
367,372
kWh
$9,290
516
kW-months/year
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,081
Cost:
$36,975
$3,901 48,105 $1,180 66 $3,901
48,105
kWh
$1,180
66
kW-months/year
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$129,890
Cost:
$2,875,288
$99,737 1,229,804 $30,153 1,684 $99,737
1,229,804
kWh
$30,153
1,684
kW-months/year
TOTAL RECOMMENDED Savings:
$294,337
Cost:
$3,317,201
$224,589 2,787,387 $69,748 3,874 $224,589
2,787,387
kWh
$69,748
3,874
kW-months/year
TOTAL IMPLEMENTED Savings:
$131,728
Cost:
$2,875,288
$101,360 1,266,117 $30,368 1,696 $101,360
1,266,117
kWh
$30,368
1,696
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand