IAC logo
IAC Assessment: SF0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 80
Plant Area (Sq.Ft.) 1,700,000
Annual Production 12,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $965,684 13,059,828 kWh $0.07
Electricity Demand $536,086 27,952 kW-months/year $19.18
Electricity Fees $64,950 - $ -
Natural Gas $189,772 30,727 MMBtu $6.18
TOTAL ENERGY COSTS $1,756,492
RECOMMENDED SAVINGS* $376,998 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $293,740
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$77,652
Cost:
$5,000
$56,271 762,482 $21,381 1,044 - - - - $56,271
762,482
kWh
$21,381
1,044
kW-months/year
-
-
$
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,634
Cost:
$8,163
$13,498 182,896 $5,136 251 - - - - $13,498
182,896
kWh
$5,136
251
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$136,139
Cost:
$189,204
$102,961 1,383,282 $33,178 1,895 - - - - $102,961
1,383,282
kWh
$33,178
1,895
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,606
Cost:
$11,795
$5,606 75,958 - - - - - - $5,606
75,958
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,106
Cost:
$10,756
$2,163 29,278 $943 65 - - - - $2,163
29,278
kWh
$943
65
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,582
Cost:
$28,175
$4,985 67,002 $1,597 91 - - - - $4,985
67,002
kWh
$1,597
91
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,835
Cost:
$60,972
$8,319 111,995 $4,516 250 - - - - $8,319
111,995
kWh
$4,516
250
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$21,277
Cost:
$149,347
- - - - - - $21,277 3,449 -
-
kWh
-
-
kW-months/year
-
-
$
$21,277
3,449
MMBtu
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$95,167
Cost:
-
- - - - $95,167 - - - -
-
kWh
-
-
kW-months/year
$95,167
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$376,998
Cost:
$463,412
$193,803 2,612,893 $66,751 3,595 $95,167 - $21,277 3,449 $193,803
2,612,893
kWh
$66,751
3,595
kW-months/year
$95,167
-
$
$21,277
3,449
MMBtu
TOTAL IMPLEMENTED Savings:
$293,740
Cost:
$446,617
$131,926 1,774,453 $45,370 2,551 $95,167 - $21,277 3,449 $131,926
1,774,453
kWh
$45,370
2,551
kW-months/year
$95,167
-
$
$21,277
3,449
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas