IAC Assessment: SF0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2012
Principal Product Wood Pallets
NAICS 321920 - Wood Container and Pallet Manufacturing
SIC 2448 - Wood Pallets And Skids
Sales $10,000,000-$50,000,000
# of Employees 118
Plant Area (Sq.Ft.) 773,190
Annual Production 400,000 Pieces
Production Hrs. Annual 3,180
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,826 514,036 kWh $0.08
Electricity Demand $28,210 2,556 kW-months/year $11.04
Electricity Fees $9,849 - $ -
LPG $154,841 6,004 MMBtu $25.79
TOTAL ENERGY COSTS $231,726
RECOMMENDED SAVINGS* $53,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,912
Cost:
-
$1,066 9,752 - - $5,846 230 - - - - - - $1,066
9,752
kWh
-
-
kW-months/year
$5,846
230
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,017
Cost:
-
$3,017 55,339 - - - - - - - - - - $3,017
55,339
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$5,494
Cost:
$10,564
- - - - $5,494 216 - - - - - - -
-
kWh
-
-
kW-months/year
$5,494
216
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$24,965
Cost:
$104,550
- - - - - - - - $24,965 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$24,965
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,801
Cost:
$22,991
$5,516 79,143 $3,285 299 - - - - - - - - $5,516
79,143
kWh
$3,285
299
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,282
Cost:
$29,386
$3,108 43,389 $765 70 - - $163 - - - $246 - $3,108
43,389
kWh
$765
70
kW-months/year
-
-
MMBtu
$163
-
$
-
-
$
$246
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$144
Cost:
$70
$114 1,638 $30 2 - - - - - - - - $114
1,638
kWh
$30
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$53,615
Cost:
$167,561
$12,821 189,261 $4,080 371 $11,340 446 $163 - $24,965 - $246 - $12,821
189,261
kWh
$4,080
371
kW-months/year
$11,340
446
MMBtu
$163
-
$
$24,965
-
$
$246
-
$
TOTAL IMPLEMENTED Savings:
$16,100
Cost:
$52,377
$11,641 177,871 $4,050 368 - - $163 - - - $246 - $11,641
177,871
kWh
$4,050
368
kW-months/year
-
-
MMBtu
$163
-
$
-
-
$
$246
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost