IAC Assessment: SF0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product asphalt shingles
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 175,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 4,800
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $392,900 4,803,131 kWh $0.08
Electricity Demand $237,654 12,971 kW-months/year $18.32
Electricity Fees $1,330 - $ -
Natural Gas $268,940 53,155 MMBtu $5.06
TOTAL ENERGY COSTS $900,824
RECOMMENDED SAVINGS* $43,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,938
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,312
Cost:
$393
$646 7,826 $666 36 - - - - $646
7,826
kWh
$666
36
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,790
Cost:
$3,152
$3,790 45,878 - - - - - - $3,790
45,878
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,785
Cost:
$9,062
$6,937 83,981 $3,848 210 - - - - $6,937
83,981
kWh
$3,848
210
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,718
Cost:
$11,431
$4,718 57,114 - - - - - - $4,718
57,114
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,030
Cost:
$21,402
$2,748 33,271 $4,282 234 - - - - $2,748
33,271
kWh
$4,282
234
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$9,806
Cost:
$46,860
- - - - - - $9,806 1,938 -
-
kWh
-
-
kW-months/year
-
-
$
$9,806
1,938
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,866
Cost:
$32,002
$5,888 71,281 - - $(-22) - - - $5,888
71,281
kWh
-
-
kW-months/year
$(-22)
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,307
Cost:
$124,302
$24,727 299,351 $8,796 480 $(-22) - $9,806 1,938 $24,727
299,351
kWh
$8,796
480
kW-months/year
$(-22)
-
$
$9,806
1,938
MMBtu
TOTAL IMPLEMENTED Savings:
$21,938
Cost:
$71,807
$7,184 86,975 $4,948 270 - - $9,806 1,938 $7,184
86,975
kWh
$4,948
270
kW-months/year
-
-
$
$9,806
1,938
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas