IAC logo
IAC Assessment: SF0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 7
Plant Area (Sq.Ft.) 467,199
Annual Production 2,154,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,887 3,133,871 kWh $0.07
Electricity Demand $28,872 8,249 kW-months/year $3.50
TOTAL ENERGY COSTS $253,759
RECOMMENDED SAVINGS* $62,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,312
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,448
Cost:
$4,896
$2,272 32,445 $176 50 - - $2,272
32,445
kWh
$176
50
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$56,039
Cost:
$250,000
$52,531 731,631 $3,508 1,002 - - $52,531
731,631
kWh
$3,508
1,002
kW-months/year
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$846
Cost:
$4,207
$706 9,828 $567 162 $(-427) (-42) $706
9,828
kWh
$567
162
kW-months/year
$(-427)
(-42)
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,864
Cost:
$15,486
$2,685 37,401 $179 52 - - $2,685
37,401
kWh
$179
52
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$62,197
Cost:
$274,589
$58,194 811,305 $4,430 1,266 $(-427) (-42) $58,194
811,305
kWh
$4,430
1,266
kW-months/year
$(-427)
(-42)
MMBtu
TOTAL IMPLEMENTED Savings:
$5,312
Cost:
$20,382
$4,957 69,846 $355 102 - - $4,957
69,846
kWh
$355
102
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas