IAC logo
IAC Assessment: SF0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product electroplating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 17,600
Annual Production 3,500 Pieces
Production Hrs. Annual 3,504
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,457 268,207 kWh $0.12
Electricity Demand $9,339 1,027 kW-months/year $9.09
Natural Gas $2,504 246 MMBtu $10.16
TOTAL ENERGY COSTS $45,300
RECOMMENDED SAVINGS* $13,987 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $438
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$6,314
Cost:
$150
$6,058 48,583 $256 29 - - - - $6,058
48,583
kWh
$256
29
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$438
Cost:
-
$315 2,525 - - - - $123 12 $315
2,525
kWh
-
-
kW-months/year
-
-
$
$123
12
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,488
Cost:
$3,272
$2,488 19,953 - - - - - - $2,488
19,953
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$864
Cost:
$2,751
$657 5,266 $207 23 - - - - $657
5,266
kWh
$207
23
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,275
Cost:
$12,405
$2,271 18,212 $389 43 $615 - - - $2,271
18,212
kWh
$389
43
kW-months/year
$615
-
$
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$608
Cost:
$2,400
$744 5,967 $123 13 - - $(-259) (-26) $744
5,967
kWh
$123
13
kW-months/year
-
-
$
$(-259)
(-26)
MMBtu
TOTAL RECOMMENDED Savings:
$13,987
Cost:
$20,978
$12,533 100,506 $975 108 $615 - $(-136) (-13) $12,533
100,506
kWh
$975
108
kW-months/year
$615
-
$
$(-136)
(-13)
MMBtu
TOTAL IMPLEMENTED Savings:
$438
Cost:
-
$315 2,525 - - - - $123 12 $315
2,525
kWh
-
-
kW-months/year
-
-
$
$123
12
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas