IAC logo
IAC Assessment: SF0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2014
Principal Product Metal Heat Treating
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 31
Plant Area (Sq.Ft.) 37,000
Annual Production 0 Units
Production Hrs. Annual 6,968
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,432 1,931,019 kWh $0.10
Electricity Demand $57,154 8,271 kW-months/year $6.91
Natural Gas $197,223 29,578 MMBtu $6.67
TOTAL ENERGY COSTS $438,809
RECOMMENDED SAVINGS* $29,528 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $404
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$9,479
Cost:
$8,763
$186 1,949 $9,293 1,394 - - $186
1,949
kWh
$9,293
1,394
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,108
Cost:
$4,124
$3,108 32,542 - - - - $3,108
32,542
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,895
Cost:
$22,758
$7,895 82,666 - - - - $7,895
82,666
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$404
Cost:
$1,967
$201 2,107 - - $203 - $201
2,107
kWh
-
-
MMBtu
$203
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,642
Cost:
$40,100
$8,642 90,486 - - - - $8,642
90,486
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,528
Cost:
$77,712
$20,032 209,750 $9,293 1,394 $203 - $20,032
209,750
kWh
$9,293
1,394
MMBtu
$203
-
$
TOTAL IMPLEMENTED Savings:
$404
Cost:
$1,967
$201 2,107 - - $203 - $201
2,107
kWh
-
-
MMBtu
$203
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost