IAC Assessment: SF0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2014
Principal Product Waste Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 210,000
Annual Production 3,988,400 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,199 2,931,323 kWh $0.08
Electricity Demand $165,051 8,102 kW-months/year $20.37
Natural Gas $70,230 16,855 MMBtu $4.17
TOTAL ENERGY COSTS $456,480
RECOMMENDED SAVINGS* $60,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,802
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,564
Cost:
-
$6,252 82,849 $2,312 114 $6,252
82,849
kWh
$2,312
114
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,245
Cost:
-
$2,245 29,747 - - $2,245
29,747
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,086
Cost:
$16,174
$21,964 291,069 $8,122 398 $21,964
291,069
kWh
$8,122
398
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,993
Cost:
$21,342
$5,835 77,325 $2,158 106 $5,835
77,325
kWh
$2,158
106
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,822
Cost:
$90,352
$8,475 112,315 $3,347 164 $8,475
112,315
kWh
$3,347
164
kW-months/year
TOTAL RECOMMENDED Savings:
$60,710
Cost:
$127,868
$44,771 593,305 $15,939 782 $44,771
593,305
kWh
$15,939
782
kW-months/year
TOTAL IMPLEMENTED Savings:
$18,802
Cost:
$21,342
$14,332 189,921 $4,470 220 $14,332
189,921
kWh
$4,470
220
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand