IAC logo
IAC Assessment: SF0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2014
Principal Product Foam Meat Trays
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 125,000
Annual Production 10 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,074,998 12,801,065 kWh $0.08
Electricity Demand $539,378 24,588 kW-months/year $21.94
Natural Gas $63,029 8,937 MMBtu $7.05
TOTAL ENERGY COSTS $1,677,405
RECOMMENDED SAVINGS* $97,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,935
Cost:
$840
$3,935 44,611 - - - - $3,935
44,611
kWh
-
-
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$477
Cost:
$131
$382 4,328 $95 4 - - $382
4,328
kWh
$95
4
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,568
Cost:
$5,796
$3,101 35,160 $467 49 - - $3,101
35,160
kWh
$467
49
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,787
Cost:
$8,897
$3,787 42,934 - - - - $3,787
42,934
kWh
-
-
kW-months/year
-
-
$
05: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$17,849
Cost:
$58,975
$13,294 150,723 $4,555 206 - - $13,294
150,723
kWh
$4,555
206
kW-months/year
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$56,698
Cost:
$210,000
- - - - $56,698 - -
-
kWh
-
-
kW-months/year
$56,698
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,640
Cost:
$28,695
$3,063 34,726 $4,577 208 - - $3,063
34,726
kWh
$4,577
208
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,552
Cost:
$15,048
$2,636 29,885 - - $916 - $2,636
29,885
kWh
-
-
kW-months/year
$916
-
$
TOTAL RECOMMENDED Savings:
$97,506
Cost:
$328,382
$30,198 342,367 $9,694 467 $57,614 - $30,198
342,367
kWh
$9,694
467
kW-months/year
$57,614
-
$
TOTAL IMPLEMENTED Savings:
$37,256
Cost:
$103,334
$27,562 312,482 $9,694 467 - - $27,562
312,482
kWh
$9,694
467
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees