IAC logo
IAC Assessment: SF0472
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0472
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2015
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 120,000
Annual Production 680,000 Units
Production Hrs. Annual 3,850
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,240 1,245,080 kWh $0.11
Electricity Demand $36,332 5,220 kW-months/year $6.96
Natural Gas $20,058 1,912 MMBtu $10.49
TOTAL ENERGY COSTS $187,630
RECOMMENDED SAVINGS* $19,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,587
Cost:
$527
$2,370 22,482 $217 31 - - - - $2,370
22,482
kWh
$217
31
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,897
Cost:
$6,325
$3,621 34,350 $276 40 - - - - $3,621
34,350
kWh
$276
40
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,873
Cost:
$4,287
$1,392 13,203 $481 70 - - - - $1,392
13,203
kWh
$481
70
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,003
Cost:
$19,142
$4,529 42,970 $512 73 $694 - $1,268 - $4,529
42,970
kWh
$512
73
kW-months/year
$694
-
$
$1,268
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,245
Cost:
$18,586
$3,894 36,943 $351 50 - - - - $3,894
36,943
kWh
$351
50
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,605
Cost:
$48,867
$15,806 149,948 $1,837 264 $694 - $1,268 - $15,806
149,948
kWh
$1,837
264
kW-months/year
$694
-
$
$1,268
-
$
TOTAL IMPLEMENTED Savings:
$15,360
Cost:
$30,281
$11,912 113,005 $1,486 214 $694 - $1,268 - $11,912
113,005
kWh
$1,486
214
kW-months/year
$694
-
$
$1,268
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material