IAC logo
IAC Assessment: SF0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2015
Principal Product Pre-Engineered Metal Buildings
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $50,000,000-$100,000,000
# of Employees 157
Plant Area (Sq.Ft.) 100,000
Annual Production 16,500 Tons
Production Hrs. Annual 6,884
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,867 1,284,226 kWh $0.15
Electricity Demand $52,330 4,277 kW-months/year $12.24
Electricity Fees $2,060 - $ -
Natural Gas $726 53 MMBtu $13.76
TOTAL ENERGY COSTS $241,985
RECOMMENDED SAVINGS* $173,347 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,559
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$7,057
Cost:
-
$6,866 47,188 - - $191 14 - - - - $6,866
47,188
kWh
-
-
kW-months/year
$191
14
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,181
Cost:
-
$2,709 18,616 - - - - $(-528) - - - $2,709
18,616
kWh
-
-
kW-months/year
-
-
MMBtu
$(-528)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,523
Cost:
$66
$1,311 9,011 $212 17 - - - - - - $1,311
9,011
kWh
$212
17
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$951
Cost:
$144
$951 6,538 - - - - - - - - $951
6,538
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,208
Cost:
$2,648
$2,224 15,284 $984 80 - - - - - - $2,224
15,284
kWh
$984
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,962
Cost:
$10,585
$10,962 75,337 - - - - - - - - $10,962
75,337
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,885
Cost:
$76,232
$25,209 173,243 $3,191 260 - - $418 - $(-3,933) - $25,209
173,243
kWh
$3,191
260
kW-months/year
-
-
MMBtu
$418
-
$
$(-3,933)
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$121,903
Cost:
$1,110,964
$121,903 837,763 - - - - - - - - $121,903
837,763
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$677
Cost:
-
- - - - - - $677 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$677
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$173,347
Cost:
$1,200,639
$172,135 1,182,980 $4,387 358 $191 14 $567 - $(-3,933) - $172,135
1,182,980
kWh
$4,387
358
kW-months/year
$191
14
MMBtu
$567
-
$
$(-3,933)
-
$
TOTAL IMPLEMENTED Savings:
$161,559
Cost:
$1,197,925
$161,734 1,111,497 $3,191 260 - - $567 - $(-3,933) - $161,734
1,111,497
kWh
$3,191
260
kW-months/year
-
-
MMBtu
$567
-
$
$(-3,933)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost