IAC logo
IAC Assessment: SF0482
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0482
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $100,000,000-$500,000,000
# of Employees 24
Plant Area (Sq.Ft.) 826,595
Annual Production 28,000 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,022 1,998,820 kWh $0.10
Electricity Demand $189,473 6,307 kW-months/year $30.04
TOTAL ENERGY COSTS $395,495
RECOMMENDED SAVINGS* $60,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,396
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,467
Cost:
-
$5,467 53,038 - - $5,467
53,038
kWh
-
-
kW-months/year
02: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$4,678
Cost:
-
$2,998 29,084 $1,680 56 $2,998
29,084
kWh
$1,680
56
kW-months/year
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$19,190
Cost:
$13,256
$19,190 186,188 - - $19,190
186,188
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,464
Cost:
$27,738
$13,472 130,703 $7,992 266 $13,472
130,703
kWh
$7,992
266
kW-months/year
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,989
Cost:
$4,000
$1,989 19,299 - - $1,989
19,299
kWh
-
-
kW-months/year
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,686
Cost:
$8,251
$2,686 26,066 - - $2,686
26,066
kWh
-
-
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,739
Cost:
$14,109
$2,488 24,137 $2,251 74 $2,488
24,137
kWh
$2,251
74
kW-months/year
TOTAL RECOMMENDED Savings:
$60,213
Cost:
$67,354
$48,290 468,515 $11,923 397 $48,290
468,515
kWh
$11,923
397
kW-months/year
TOTAL IMPLEMENTED Savings:
$29,396
Cost:
$27,365
$27,145 263,363 $2,251 74 $27,145
263,363
kWh
$2,251
74
kW-months/year
Savings
Cost
$ kWh $ kW-months/year