IAC logo
IAC Assessment: SF0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $100,000,000-$500,000,000
# of Employees 9
Plant Area (Sq.Ft.) 491,825
Annual Production 9,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,404 1,273,878 kWh $0.07
Electricity Demand $211,582 7,229 kW-months/year $29.27
TOTAL ENERGY COSTS $303,986
RECOMMENDED SAVINGS* $38,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,527
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,773
Cost:
-
$905 12,480 $868 30 - - $905
12,480
kWh
$868
30
kW-months/year
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,441
Cost:
$2,520
$4,441 61,262 - - - - $4,441
61,262
kWh
-
-
kW-months/year
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$9,855
Cost:
$16,147
$9,855 135,854 - - - - $9,855
135,854
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,458
Cost:
$15,229
$5,853 80,683 $2,605 90 - - $5,853
80,683
kWh
$2,605
90
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,391
Cost:
$47,502
$8,127 112,030 $4,228 146 $1,036 - $8,127
112,030
kWh
$4,228
146
kW-months/year
$1,036
-
$
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$720
Cost:
$4,000
$720 9,936 - - - - $720
9,936
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$38,638
Cost:
$85,398
$29,901 412,245 $7,701 266 $1,036 - $29,901
412,245
kWh
$7,701
266
kW-months/year
$1,036
-
$
TOTAL IMPLEMENTED Savings:
$24,527
Cost:
$33,896
$21,054 290,279 $3,473 120 - - $21,054
290,279
kWh
$3,473
120
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes