Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2016 |
Principal Product | Lactose and Whey Protein |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $10,000,000-$50,000,000 |
# of Employees | 58 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 74,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,899,531 | 24,338,244 | kWh | $0.08 |
Electricity Demand | $633,724 | 39,276 | kW-months/year | $16.14 |
TOTAL ENERGY COSTS | $2,533,255 | |||
RECOMMENDED SAVINGS* | $75,646 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,094 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $5,356 Cost: - |
$3,489 | 44,690 | - | - | $1,867 | 337 | - | - | - | - |
$3,489 44,690 kWh |
- - kW-months/year |
$1,867 337 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $13,545 Cost: - |
$10,556 | 135,208 | $2,989 | 185 | - | - | - | - | - | - |
$10,556 135,208 kWh |
$2,989 185 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,132 Cost: $534 |
- | - | - | - | $2,132 | 385 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,132 385 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,944 Cost: $11,650 |
$24,944 | 319,507 | - | - | - | - | - | - | - | - |
$24,944 319,507 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,738 Cost: $17,574 |
$15,361 | 196,763 | $4,130 | 256 | - | - | $635 | - | $(-1,388) | - |
$15,361 196,763 kWh |
$4,130 256 kW-months/year |
- - MMBtu |
$635 - $ |
$(-1,388) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $3,794 Cost: $3,610 |
$3,794 | 48,596 | - | - | - | - | - | - | - | - |
$3,794 48,596 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $7,137 Cost: $27,407 |
$5,891 | 75,454 | $1,246 | 77 | - | - | - | - | - | - |
$5,891 75,454 kWh |
$1,246 77 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,646 Cost: $60,775 |
$64,035 | 820,218 | $8,365 | 518 | $3,999 | 722 | $635 | - | $(-1,388) | - | $64,035 820,218 kWh |
$8,365 518 kW-months/year |
$3,999 722 MMBtu |
$635 - $ |
$(-1,388) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,094 Cost: $17,574 |
$18,850 | 241,453 | $4,130 | 256 | $1,867 | 337 | $635 | - | $(-1,388) | - | $18,850 241,453 kWh |
$4,130 256 kW-months/year |
$1,867 337 MMBtu |
$635 - $ |
$(-1,388) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |