IAC logo
IAC Assessment: SF0487
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0487
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2016
Principal Product Lactose and Whey Protein
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 58
Plant Area (Sq.Ft.) 250,000
Annual Production 74,000 Tons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,899,531 24,338,244 kWh $0.08
Electricity Demand $633,724 39,276 kW-months/year $16.14
TOTAL ENERGY COSTS $2,533,255
RECOMMENDED SAVINGS* $75,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,094
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,356
Cost:
-
$3,489 44,690 - - $1,867 337 - - - - $3,489
44,690
kWh
-
-
kW-months/year
$1,867
337
MMBtu
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$13,545
Cost:
-
$10,556 135,208 $2,989 185 - - - - - - $10,556
135,208
kWh
$2,989
185
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,132
Cost:
$534
- - - - $2,132 385 - - - - -
-
kWh
-
-
kW-months/year
$2,132
385
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,944
Cost:
$11,650
$24,944 319,507 - - - - - - - - $24,944
319,507
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,738
Cost:
$17,574
$15,361 196,763 $4,130 256 - - $635 - $(-1,388) - $15,361
196,763
kWh
$4,130
256
kW-months/year
-
-
MMBtu
$635
-
$
$(-1,388)
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,794
Cost:
$3,610
$3,794 48,596 - - - - - - - - $3,794
48,596
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,137
Cost:
$27,407
$5,891 75,454 $1,246 77 - - - - - - $5,891
75,454
kWh
$1,246
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$75,646
Cost:
$60,775
$64,035 820,218 $8,365 518 $3,999 722 $635 - $(-1,388) - $64,035
820,218
kWh
$8,365
518
kW-months/year
$3,999
722
MMBtu
$635
-
$
$(-1,388)
-
$
TOTAL IMPLEMENTED Savings:
$24,094
Cost:
$17,574
$18,850 241,453 $4,130 256 $1,867 337 $635 - $(-1,388) - $18,850
241,453
kWh
$4,130
256
kW-months/year
$1,867
337
MMBtu
$635
-
$
$(-1,388)
-
$