Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2016 |
Principal Product | Wine |
NAICS | 312130 - Wineries |
SIC | 2084 - Wines, Brandy, And Brandy Spirits |
Sales | $100,000,000-$500,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 370,260 |
Annual Production | 115,000 Units |
Production Hrs. Annual | 6,960 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $384,586 | 4,170,722 | kWh | $0.09 |
Electricity Demand | $407,699 | 14,993 | kW-months/year | $27.19 |
LPG | $68,043 | 4,606 | MMBtu | $14.77 |
TOTAL ENERGY COSTS | $860,328 | |||
RECOMMENDED SAVINGS* | $62,883 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,027 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $14,980 Cost: - |
$14,980 | 162,455 | - | - | - | - |
$14,980 162,455 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $5,509 Cost: $840 |
$5,509 | 68,855 | - | - | - | - |
$5,509 68,855 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,138 Cost: $882 |
- | - | - | - | $6,138 | 416 |
- - kWh |
- - kW-months/year |
$6,138 416 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $464 Cost: $70 |
$290 | 3,150 | $174 | 6 | - | - |
$290 3,150 kWh |
$174 6 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,183 Cost: $1,469 |
$1,183 | 12,828 | - | - | - | - |
$1,183 12,828 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $582 Cost: $1,469 |
$582 | 6,314 | - | - | - | - |
$582 6,314 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,217 Cost: $44,943 |
$16,332 | 177,118 | $885 | 32 | - | - |
$16,332 177,118 kWh |
$885 32 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $16,810 Cost: $61,903 |
$16,810 | 182,694 | - | - | - | - |
$16,810 182,694 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,883 Cost: $111,576 |
$55,686 | 613,414 | $1,059 | 39 | $6,138 | 416 | $55,686 613,414 kWh |
$1,059 39 kW-months/year |
$6,138 416 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,027 Cost: $48,134 |
$38,004 | 421,256 | $885 | 32 | $6,138 | 416 | $38,004 421,256 kWh |
$885 32 kW-months/year |
$6,138 416 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG |