IAC Assessment: SF0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2017
Principal Product wastewater, recycled water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 741,826
Annual Production 3,250,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $830,560 8,174,462 kWh $0.10
Electricity Demand $337,325 15,086 kW-months/year $22.36
TOTAL ENERGY COSTS $1,167,885
RECOMMENDED SAVINGS* $207,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,126
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$852
Cost:
$90
$655 6,446 $197 9 - - - - - - $655
6,446
kWh
$197
9
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,991
Cost:
$546
$1,991 19,605 - - - - - - - - $1,991
19,605
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,454
Cost:
$23,168
$19,293 189,893 $3,505 157 - - $1,585 - $(-1,929) - $19,293
189,893
kWh
$3,505
157
kW-months/year
-
-
MMBtu
$1,585
-
$
$(-1,929)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,681
Cost:
$3,001
$1,277 12,567 $404 18 - - - - - - $1,277
12,567
kWh
$404
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,437
Cost:
$21,315
$4,947 48,690 $1,490 67 - - - - - - $4,947
48,690
kWh
$1,490
67
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$4,855
Cost:
$20,327
$4,855 47,785 - - - - - - - - $4,855
47,785
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$169,204
Cost:
$790,554
$272,383 2,680,938 $82,397 3,685 $(-59,003) (-10,363) $(-126,573) - - - $272,383
2,680,938
kWh
$82,397
3,685
kW-months/year
$(-59,003)
(-10,363)
MMBtu
$(-126,573)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$207,474
Cost:
$859,001
$305,401 3,005,924 $87,993 3,936 $(-59,003) (-10,363) $(-124,988) - $(-1,929) - $305,401
3,005,924
kWh
$87,993
3,936
kW-months/year
$(-59,003)
(-10,363)
MMBtu
$(-124,988)
-
$
$(-1,929)
-
$
TOTAL IMPLEMENTED Savings:
$26,126
Cost:
$26,715
$22,561 222,065 $3,909 175 - - $1,585 - $(-1,929) - $22,561
222,065
kWh
$3,909
175
kW-months/year
-
-
MMBtu
$1,585
-
$
$(-1,929)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost