IAC Assessment: SF0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2017
Principal Product Wood and Plastic Store Fixtures for Retail Displays
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 100,000
Annual Production 500,000 Units
Production Hrs. Annual 2,808
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,057 934,777 kWh $0.11
Electricity Demand $33,438 4,568 kW-months/year $7.32
TOTAL ENERGY COSTS $181,806
RECOMMENDED SAVINGS* $127,511 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,784
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,101
Cost:
-
$4,941 43,552 - - $(-840) - - - - - $4,941
43,552
kWh
-
-
kW-months/year
$(-840)
-
$
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$339
Cost:
-
$339 2,988 - - - - - - - - $339
2,988
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$13,580
Cost:
$177
$13,580 119,691 - - - - - - - - $13,580
119,691
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,342
Cost:
$210
$1,052 9,274 $290 40 - - - - - - $1,052
9,274
kWh
$290
40
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$417
Cost:
$178
$130 1,142 $287 39 - - - - - - $130
1,142
kWh
$287
39
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,025
Cost:
$3,196
$1,500 13,223 - - $290 - - - $235 - $1,500
13,223
kWh
-
-
kW-months/year
$290
-
$
-
-
$
$235
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,507
Cost:
$21,536
$8,507 74,977 - - - - - - - - $8,507
74,977
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,733
Cost:
$56,494
$12,095 106,601 $3,638 497 - - - - - - $12,095
106,601
kWh
$3,638
497
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$65,652
Cost:
$583,671
$56,314 496,335 $9,338 1,275 - - - - - - $56,314
496,335
kWh
$9,338
1,275
kW-months/year
-
-
$
-
-
$
-
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,815
Cost:
$27,742
$(-245) (-2,159) $(-728) (-99) - - $16,788 - - - $(-245)
(-2,159)
kWh
$(-728)
(-99)
kW-months/year
-
-
$
$16,788
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$127,511
Cost:
$693,204
$98,213 865,624 $12,825 1,751 $(-550) - $16,788 - $235 - $98,213
865,624
kWh
$12,825
1,751
kW-months/year
$(-550)
-
$
$16,788
-
$
$235
-
$
TOTAL IMPLEMENTED Savings:
$44,784
Cost:
$52,829
$28,752 253,414 $(-441) (-60) $(-550) - $16,788 - $235 - $28,752
253,414
kWh
$(-441)
(-60)
kW-months/year
$(-550)
-
$
$16,788
-
$
$235
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost