IAC logo
IAC Assessment: SF0505
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0505
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2017
Principal Product Biodiesel
NAICS 324110 - Petroleum Refineries
SIC 2911 - Petroleum Refining
Sales $10,000,000-$50,000,000
# of Employees 17
Plant Area (Sq.Ft.) 140,000
Annual Production 8,000 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $407,495 2,670,602 kWh $0.15
Electricity Demand $37,644 8,448 kW-months/year $4.46
Natural Gas $279,412 38,086 MMBtu $7.34
TOTAL ENERGY COSTS $724,551
RECOMMENDED SAVINGS* $85,563 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,897
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$23,294
Cost:
$4,639
$23,294 154,429 - - - - - - - - $23,294
154,429
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$486
Cost:
$86
$458 3,036 $28 6 - - - - - - $458
3,036
kWh
$28
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$7,070
Cost:
$1,651
$6,657 44,135 $413 85 - - - - - - $6,657
44,135
kWh
$413
85
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,325
Cost:
$6,323
$14,325 94,968 - - - - - - - - $14,325
94,968
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,816
Cost:
$6,103
$8,816 58,444 - - - - - - - - $8,816
58,444
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,675
Cost:
$28,219
$23,621 156,598 $1,954 401 - - $1,021 - $79 - $23,621
156,598
kWh
$1,954
401
kW-months/year
-
-
MMBtu
$1,021
-
$
$79
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,828
Cost:
$5,423
- - - - $3,828 522 - - - - -
-
kWh
-
-
kW-months/year
$3,828
522
MMBtu
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,069
Cost:
$1,882
$1,069 7,087 - - - - - - - - $1,069
7,087
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$85,563
Cost:
$54,326
$78,240 518,697 $2,395 492 $3,828 522 $1,021 - $79 - $78,240
518,697
kWh
$2,395
492
kW-months/year
$3,828
522
MMBtu
$1,021
-
$
$79
-
$
TOTAL IMPLEMENTED Savings:
$4,897
Cost:
$7,305
$1,069 7,087 - - $3,828 522 - - - - $1,069
7,087
kWh
-
-
kW-months/year
$3,828
522
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost