Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2017 |
Principal Product | Finished Wines |
NAICS | 312130 - Wineries |
SIC | 2084 - Wines, Brandy, And Brandy Spirits |
Sales | $100,000,000-$500,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 600,000 |
Annual Production | 18,500 Thousand Gallons |
Production Hrs. Annual | 6,408 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $569,139 | 6,591,372 | kWh | $0.09 |
Electricity Demand | $388,859 | 21,132 | kW-months/year | $18.40 |
Natural Gas | $21,807 | 1,886 | MMBtu | $11.57 |
TOTAL ENERGY COSTS | $979,805 | |||
RECOMMENDED SAVINGS* | $197,836 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $197,836 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,318 Cost: - |
$3,990 | 46,211 | - | - | - | - | $(-672) | - | - | - |
$3,990 46,211 kWh |
- - kW-months/year |
- - MMBtu |
$(-672) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE |
Savings: $7,895 Cost: $560 |
$8,455 | 97,917 | - | - | - | - | $(-560) | - | - | - |
$8,455 97,917 kWh |
- - kW-months/year |
- - MMBtu |
$(-560) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,567 Cost: $156 |
$1,567 | 18,148 | - | - | - | - | - | - | - | - |
$1,567 18,148 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,398 Cost: $3,902 |
$604 | 6,996 | - | - | $7,794 | 674 | - | - | - | - |
$604 6,996 kWh |
- - kW-months/year |
$7,794 674 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $116,456 Cost: $172,681 |
$63,450 | 734,805 | $31,858 | 1,728 | - | - | $22,714 | - | $(-1,566) | - |
$63,450 734,805 kWh |
$31,858 1,728 kW-months/year |
- - MMBtu |
$22,714 - $ |
$(-1,566) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,369 Cost: $12,526 |
$6,085 | 70,467 | $2,761 | 150 | $(-3,477) | (-301) | - | - | - | - |
$6,085 70,467 kWh |
$2,761 150 kW-months/year |
$(-3,477) (-301) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $54,833 Cost: $312,470 |
$54,833 | 635,003 | - | - | - | - | - | - | - | - |
$54,833 635,003 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $197,836 Cost: $502,295 |
$138,984 | 1,609,547 | $34,619 | 1,878 | $4,317 | 373 | $21,482 | - | $(-1,566) | - | $138,984 1,609,547 kWh |
$34,619 1,878 kW-months/year |
$4,317 373 MMBtu |
$21,482 - $ |
$(-1,566) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $197,836 Cost: $502,295 |
$138,984 | 1,609,547 | $34,619 | 1,878 | $4,317 | 373 | $21,482 | - | $(-1,566) | - | $138,984 1,609,547 kWh |
$34,619 1,878 kW-months/year |
$4,317 373 MMBtu |
$21,482 - $ |
$(-1,566) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |