Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2017 |
Principal Product | Circuit Board Plating |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 28 |
Plant Area (Sq.Ft.) | 10,000 |
Annual Production | 12,000,000 Units |
Production Hrs. Annual | 5,720 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $120,521 | 784,954 | kWh | $0.15 |
Electricity Demand | $50,846 | 1,815 | kW-months/year | $28.01 |
Natural Gas | $14,196 | 1,247 | MMBtu | $11.38 |
TOTAL ENERGY COSTS | $185,563 | |||
RECOMMENDED SAVINGS* | $9,993 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,993 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,043 Cost: - |
$3,291 | 21,431 | - | - | - | - | $(-1,248) | - | - | - |
$3,291 21,431 kWh |
- - kW-months/year |
- - MMBtu |
$(-1,248) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,680 Cost: - |
$1,116 | 7,266 | $564 | 20 | - | - | - | - | - | - |
$1,116 7,266 kWh |
$564 20 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2514 COVER OPEN TANKS |
Savings: $2,660 Cost: $1,059 |
$2,660 | 17,322 | - | - | - | - | - | - | - | - |
$2,660 17,322 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $824 Cost: $1,526 |
- | - | - | - | $824 | 72 | - | - | - | - |
- - kWh |
- - kW-months/year |
$824 72 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,786 Cost: $5,219 |
$2,101 | 13,682 | $171 | 6 | - | - | - | - | $514 | - |
$2,101 13,682 kWh |
$171 6 kW-months/year |
- - MMBtu |
- - $ |
$514 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,993 Cost: $7,804 |
$9,168 | 59,701 | $735 | 26 | $824 | 72 | $(-1,248) | - | $514 | - | $9,168 59,701 kWh |
$735 26 kW-months/year |
$824 72 MMBtu |
$(-1,248) - $ |
$514 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,993 Cost: $7,804 |
$9,168 | 59,701 | $735 | 26 | $824 | 72 | $(-1,248) | - | $514 | - | $9,168 59,701 kWh |
$735 26 kW-months/year |
$824 72 MMBtu |
$(-1,248) - $ |
$514 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |