IAC Assessment: SF0511
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0511
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2017
Principal Product Circuit Board Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 28
Plant Area (Sq.Ft.) 10,000
Annual Production 12,000,000 Units
Production Hrs. Annual 5,720
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,521 784,954 kWh $0.15
Electricity Demand $50,846 1,815 kW-months/year $28.01
Natural Gas $14,196 1,247 MMBtu $11.38
TOTAL ENERGY COSTS $185,563
RECOMMENDED SAVINGS* $9,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,993
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,043
Cost:
-
$3,291 21,431 - - - - $(-1,248) - - - $3,291
21,431
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,248)
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$1,680
Cost:
-
$1,116 7,266 $564 20 - - - - - - $1,116
7,266
kWh
$564
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$2,660
Cost:
$1,059
$2,660 17,322 - - - - - - - - $2,660
17,322
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$824
Cost:
$1,526
- - - - $824 72 - - - - -
-
kWh
-
-
kW-months/year
$824
72
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,786
Cost:
$5,219
$2,101 13,682 $171 6 - - - - $514 - $2,101
13,682
kWh
$171
6
kW-months/year
-
-
MMBtu
-
-
$
$514
-
$
TOTAL RECOMMENDED Savings:
$9,993
Cost:
$7,804
$9,168 59,701 $735 26 $824 72 $(-1,248) - $514 - $9,168
59,701
kWh
$735
26
kW-months/year
$824
72
MMBtu
$(-1,248)
-
$
$514
-
$
TOTAL IMPLEMENTED Savings:
$9,993
Cost:
$7,804
$9,168 59,701 $735 26 $824 72 $(-1,248) - $514 - $9,168
59,701
kWh
$735
26
kW-months/year
$824
72
MMBtu
$(-1,248)
-
$
$514
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost