IAC logo
IAC Assessment: SF0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Recycled Packaging
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 50,000
Annual Production 758,400 Units
Production Hrs. Annual 2,210
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,534 694,523 kWh $0.14
Electricity Demand $56,352 3,872 kW-months/year $14.55
Natural Gas $4,657 374 MMBtu $12.44
TOTAL ENERGY COSTS $155,543
RECOMMENDED SAVINGS* $69,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,862
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,199
Cost:
-
$1,739 12,736 - - - - $(-540) - - - $1,739
12,736
kWh
-
-
kW-months/year
-
-
MMBtu
$(-540)
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,566
Cost:
$698
$983 7,203 - - $3,583 288 - - - - $983
7,203
kWh
-
-
kW-months/year
$3,583
288
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,202
Cost:
$9,352
$5,043 36,945 - - - - $1,257 - $(-98) - $5,043
36,945
kWh
-
-
kW-months/year
-
-
MMBtu
$1,257
-
$
$(-98)
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$118
Cost:
$389
- - - - $118 10 - - - - -
-
kWh
-
-
kW-months/year
$118
10
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,777
Cost:
$31,273
$3,821 27,994 $1,570 108 - - $1,403 - $(-17) - $3,821
27,994
kWh
$1,570
108
kW-months/year
-
-
MMBtu
$1,403
-
$
$(-17)
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$50,506
Cost:
$343,102
$50,506 369,950 - - - - - - - - $50,506
369,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$69,368
Cost:
$384,814
$62,092 454,828 $1,570 108 $3,701 298 $2,120 - $(-115) - $62,092
454,828
kWh
$1,570
108
kW-months/year
$3,701
298
MMBtu
$2,120
-
$
$(-115)
-
$
TOTAL IMPLEMENTED Savings:
$18,862
Cost:
$41,712
$11,586 84,878 $1,570 108 $3,701 298 $2,120 - $(-115) - $11,586
84,878
kWh
$1,570
108
kW-months/year
$3,701
298
MMBtu
$2,120
-
$
$(-115)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost