IAC logo
IAC Assessment: SF0513
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Freeze-Dried Fruits, Vegetables and Meats
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 240,000
Annual Production 6,600,000 Pounds
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,362,024 18,985,441 kWh $0.07
Electricity Demand $582,814 32,779 kW-months/year $17.78
Natural Gas $260,754 40,432 MMBtu $6.45
TOTAL ENERGY COSTS $2,205,592
RECOMMENDED SAVINGS* $321,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $309,032
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,923
Cost:
-
$6,923 96,498 - - - - - - $6,923
96,498
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$177,909
Cost:
$41,250
$177,909 2,479,908 - - - - - - $177,909
2,479,908
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$66,148
Cost:
$67,793
$42,089 586,692 $16,370 920 $6,795 - $894 - $42,089
586,692
kWh
$16,370
920
kW-months/year
$6,795
-
$
$894
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,395
Cost:
$10,091
$5,395 75,204 - - - - - - $5,395
75,204
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$64,975
Cost:
$191,474
$48,547 676,712 $16,428 924 - - - - $48,547
676,712
kWh
$16,428
924
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$321,350
Cost:
$310,608
$280,863 3,915,014 $32,798 1,844 $6,795 - $894 - $280,863
3,915,014
kWh
$32,798
1,844
kW-months/year
$6,795
-
$
$894
-
$
TOTAL IMPLEMENTED Savings:
$309,032
Cost:
$300,517
$268,545 3,743,312 $32,798 1,844 $6,795 - $894 - $268,545
3,743,312
kWh
$32,798
1,844
kW-months/year
$6,795
-
$
$894
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $