Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2018 |
Principal Product | Freeze-Dried Fruits, Vegetables and Meats |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 6,600,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,362,024 | 18,985,441 | kWh | $0.07 |
Electricity Demand | $582,814 | 32,779 | kW-months/year | $17.78 |
Natural Gas | $260,754 | 40,432 | MMBtu | $6.45 |
TOTAL ENERGY COSTS | $2,205,592 | |||
RECOMMENDED SAVINGS* | $321,350 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $309,032 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $6,923 Cost: - |
$6,923 | 96,498 | - | - | - | - | - | - |
$6,923 96,498 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $177,909 Cost: $41,250 |
$177,909 | 2,479,908 | - | - | - | - | - | - |
$177,909 2,479,908 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $66,148 Cost: $67,793 |
$42,089 | 586,692 | $16,370 | 920 | $6,795 | - | $894 | - |
$42,089 586,692 kWh |
$16,370 920 kW-months/year |
$6,795 - $ |
$894 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,395 Cost: $10,091 |
$5,395 | 75,204 | - | - | - | - | - | - |
$5,395 75,204 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $64,975 Cost: $191,474 |
$48,547 | 676,712 | $16,428 | 924 | - | - | - | - |
$48,547 676,712 kWh |
$16,428 924 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $321,350 Cost: $310,608 |
$280,863 | 3,915,014 | $32,798 | 1,844 | $6,795 | - | $894 | - | $280,863 3,915,014 kWh |
$32,798 1,844 kW-months/year |
$6,795 - $ |
$894 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $309,032 Cost: $300,517 |
$268,545 | 3,743,312 | $32,798 | 1,844 | $6,795 | - | $894 | - | $268,545 3,743,312 kWh |
$32,798 1,844 kW-months/year |
$6,795 - $ |
$894 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |