IAC logo
IAC Assessment: SF0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Glassware
NAICS 327212 - Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229 - Pressed And Blown Glass, Nec
Sales $1,000,000-$5,000,000
# of Employees 14
Plant Area (Sq.Ft.) 7,500
Annual Production 71,000 Units
Production Hrs. Annual 8,688
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,114 119,094 kWh $0.17
Electricity Demand $10,504 571 kW-months/year $18.39
Natural Gas $64,644 6,431 MMBtu $10.05
TOTAL ENERGY COSTS $95,262
RECOMMENDED SAVINGS* $49,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$13,874
Cost:
$3,023
- - - - $13,874 1,380 - - - - -
-
kWh
-
-
kW-months/year
$13,874
1,380
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,220
Cost:
$4,857
$7,471 44,234 $749 41 - - - - - - $7,471
44,234
kWh
$749
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,611
Cost:
$15,000
- - - - $17,611 1,752 - - - - -
-
kWh
-
-
kW-months/year
$17,611
1,752
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,777
Cost:
$2,300
$1,070 6,337 $472 25 - - $99 - $136 - $1,070
6,337
kWh
$472
25
kW-months/year
-
-
MMBtu
$99
-
$
$136
-
$
05: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$2,098
Cost:
$6,325
- - - - $2,098 209 - - - - -
-
kWh
-
-
kW-months/year
$2,098
209
MMBtu
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$6,223
Cost:
$45,702
$6,223 36,844 - - - - - - - - $6,223
36,844
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$49,803
Cost:
$77,207
$14,764 87,415 $1,221 66 $33,583 3,341 $99 - $136 - $14,764
87,415
kWh
$1,221
66
kW-months/year
$33,583
3,341
MMBtu
$99
-
$
$136
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost