IAC logo
IAC Assessment: SF0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Office Furniture
NAICS 337211 - Wood Office Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 88,000
Annual Production 36,000 Units
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,000 929,182 kWh $0.18
Electricity Demand $64,537 4,113 kW-months/year $15.69
Natural Gas $27,872 2,356 MMBtu $11.83
TOTAL ENERGY COSTS $257,409
RECOMMENDED SAVINGS* $172,832 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $172,832
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,001
Cost:
$1,610
$8,001 45,057 - - - - - - $8,001
45,057
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$130
Cost:
$44
$54 307 $76 5 - - - - $54
307
kWh
$76
5
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,444
Cost:
$3,798
$3,491 19,658 $953 61 - - - - $3,491
19,658
kWh
$953
61
kW-months/year
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,084
Cost:
$2,146
$2,084 11,733 - - - - - - $2,084
11,733
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,270
Cost:
$22,190
$9,411 52,996 $2,471 157 $852 - $(-464) - $9,411
52,996
kWh
$2,471
157
kW-months/year
$852
-
$
$(-464)
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,634
Cost:
$44,294
$23,634 133,090 - - - - - - $23,634
133,090
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,263
Cost:
$61,175
$28,263 159,155 - - - - - - $28,263
159,155
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$94,006
Cost:
$487,058
$94,006 529,371 - - - - - - $94,006
529,371
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$172,832
Cost:
$622,315
$168,944 951,367 $3,500 223 $852 - $(-464) - $168,944
951,367
kWh
$3,500
223
kW-months/year
$852
-
$
$(-464)
-
$
TOTAL IMPLEMENTED Savings:
$172,832
Cost:
$622,315
$168,944 951,367 $3,500 223 $852 - $(-464) - $168,944
951,367
kWh
$3,500
223
kW-months/year
$852
-
$
$(-464)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost