IAC logo
IAC Assessment: SF0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Energetic Devices for Aircraft, Rockets, and Launch Devices
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 180,000
Annual Production 5,000 Units
Production Hrs. Annual 2,678
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,293 2,360,427 kWh $0.11
Electricity Demand $188,726 7,452 kW-months/year $25.33
Fuel Oil #1 $58,361 2,441 MMBtu $23.91
TOTAL ENERGY COSTS $506,380
RECOMMENDED SAVINGS* $38,235 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,235
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$872
Cost:
$204
$872 7,941 - - - - - - - - $872
7,941
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,653
Cost:
$386
- - - - $1,653 69 - - - - -
-
kWh
-
-
kW-months/year
$1,653
69
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,710
Cost:
$163,709
$18,391 167,418 $16,557 654 - - $1,987 - $(-1,225) - $18,391
167,418
kWh
$16,557
654
kW-months/year
-
-
MMBtu
$1,987
-
$
$(-1,225)
-
$
TOTAL RECOMMENDED Savings:
$38,235
Cost:
$164,299
$19,263 175,359 $16,557 654 $1,653 69 $1,987 - $(-1,225) - $19,263
175,359
kWh
$16,557
654
kW-months/year
$1,653
69
MMBtu
$1,987
-
$
$(-1,225)
-
$
TOTAL IMPLEMENTED Savings:
$38,235
Cost:
$164,299
$19,263 175,359 $16,557 654 $1,653 69 $1,987 - $(-1,225) - $19,263
175,359
kWh
$16,557
654
kW-months/year
$1,653
69
MMBtu
$1,987
-
$
$(-1,225)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #1 Personnel Changes Primary Raw Material