IAC Assessment: SF0525
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0525
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Structural Steel
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 283,000
Annual Production 5,000 Tons
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $245,655 1,098,760 kWh $0.22
Electricity Fees $31,644 - $ -
Natural Gas $7,091 481 MMBtu $14.75
TOTAL ENERGY COSTS $284,390
RECOMMENDED SAVINGS* $256,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $128,472
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ $ $ MMBtu $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$49,766
Cost:
-
$49,766 197,193 - - - - - - - - - - $49,766
197,193
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,260
Cost:
-
$17,220 68,238 - - - - $(-960) - - - - - $17,220
68,238
kWh
-
-
$
-
-
MMBtu
$(-960)
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,078
Cost:
$160
$2,078 8,232 - - - - - - - - - - $2,078
8,232
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,086
Cost:
$354
$80 315 - - $3,006 204 - - - - - - $80
315
kWh
-
-
$
$3,006
204
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$60,368
Cost:
$59,620
$57,443 227,614 - - - - $2,190 - - - $735 - $57,443
227,614
kWh
-
-
$
-
-
MMBtu
$2,190
-
$
-
-
$
$735
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$124,618
Cost:
$491,526
$115,232 456,598 $8,498 - - - - - $888 - - - $115,232
456,598
kWh
$8,498
-
$
-
-
MMBtu
-
-
$
$888
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$256,176
Cost:
$551,660
$241,819 958,190 $8,498 - $3,006 204 $1,230 - $888 - $735 - $241,819
958,190
kWh
$8,498
-
$
$3,006
204
MMBtu
$1,230
-
$
$888
-
$
$735
-
$
TOTAL IMPLEMENTED Savings:
$128,472
Cost:
$59,780
$126,507 501,277 - - - - $1,230 - - - $735 - $126,507
501,277
kWh
-
-
$
-
-
MMBtu
$1,230
-
$
-
-
$
$735
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost