IAC Assessment: SF0527
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0527
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2018
Principal Product Medium Voltage Switches and Brackets
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 110,000
Annual Production 4,900 Units
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,768 443,654 kWh $0.20
Natural Gas $4,116 327 MMBtu $12.60
TOTAL ENERGY COSTS $91,884
RECOMMENDED SAVINGS* $92,612 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,577
Cost:
-
$4,997 25,261 - - - - - - $(-420) - $4,997
25,261
kWh
-
-
kW-months/year
-
-
$
-
-
$
$(-420)
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$545
Cost:
$70
$545 2,756 - - - - - - - - $545
2,756
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,584
Cost:
$27,496
$10,298 52,057 - - $437 - - - $(-151) - $10,298
52,057
kWh
-
-
kW-months/year
$437
-
$
-
-
$
$(-151)
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$76,906
Cost:
$341,292
$69,309 438,831 $6,611 348 - - $986 - - - $69,309
438,831
kWh
$6,611
348
kW-months/year
-
-
$
$986
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,612
Cost:
$368,858
$85,149 518,905 $6,611 348 $437 - $986 - $(-571) - $85,149
518,905
kWh
$6,611
348
kW-months/year
$437
-
$
$986
-
$
$(-571)
-
$
TOTAL IMPLEMENTED Savings:
$15,706
Cost:
$27,566
$15,840 80,074 - - $437 - - - $(-571) - $15,840
80,074
kWh
-
-
kW-months/year
$437
-
$
-
-
$
$(-571)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost