IAC logo
IAC Assessment: SF0532
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0532
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Tofu and Soy Products
NAICS 311224 - Soybean and Other Oilseed Processing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 35,000
Annual Production 6,300,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,442 962,538 kWh $0.15
Electricity Demand $58,061 2,184 kW-months/year $26.58
Natural Gas $144,043 13,576 MMBtu $10.61
TOTAL ENERGY COSTS $350,545
RECOMMENDED SAVINGS* $42,651 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,112
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$879
Cost:
-
$879 5,697 - - - - - - - - $879
5,697
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,844
Cost:
$20,718
$10,186 67,351 $3,184 120 - - $619 - $(-145) - $10,186
67,351
kWh
$3,184
120
kW-months/year
-
-
MMBtu
$619
-
$
$(-145)
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,762
Cost:
$4,681
- - - - $2,762 260 - - - - -
-
kWh
-
-
kW-months/year
$2,762
260
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,777
Cost:
$4,972
- - - - $1,777 168 - - - - -
-
kWh
-
-
kW-months/year
$1,777
168
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$950
Cost:
$2,757
$769 4,986 $181 7 - - - - - - $769
4,986
kWh
$181
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,025
Cost:
$8,491
$2,025 13,131 - - - - - - - - $2,025
13,131
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$20,414
Cost:
$108,576
- - - - $20,414 1,924 - - - - -
-
kWh
-
-
kW-months/year
$20,414
1,924
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$42,651
Cost:
$150,195
$13,859 91,165 $3,365 127 $24,953 2,352 $619 - $(-145) - $13,859
91,165
kWh
$3,365
127
kW-months/year
$24,953
2,352
MMBtu
$619
-
$
$(-145)
-
$
TOTAL IMPLEMENTED Savings:
$38,112
Cost:
$140,542
$13,859 91,165 $3,365 127 $20,414 1,924 $619 - $(-145) - $13,859
91,165
kWh
$3,365
127
kW-months/year
$20,414
1,924
MMBtu
$619
-
$
$(-145)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost