IAC logo
IAC Assessment: SF0533
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0533
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product wine
NAICS 312130 - Wineries
SIC 2084 - Wines, Brandy, And Brandy Spirits
Sales $100,000,000-$500,000,000
# of Employees 177
Plant Area (Sq.Ft.) 552,017
Annual Production 12,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $502,026 4,332,924 kWh $0.12
Electricity Demand $345,666 11,681 kW-months/year $29.59
Natural Gas $118,471 15,832 MMBtu $7.48
TOTAL ENERGY COSTS $966,163
RECOMMENDED SAVINGS* $173,620 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $133,624
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,552
Cost:
-
- - - - $10,552 1,410 - - - - -
-
kWh
-
-
kW-months/year
$10,552
1,410
MMBtu
-
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,167
Cost:
$1,440
$5,167 48,927 - - - - - - - - $5,167
48,927
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$39,996
Cost:
$12,500
$39,996 378,754 - - - - - - - - $39,996
378,754
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,254
Cost:
$4,129
$10,712 101,436 $4,542 139 - - - - - - $10,712
101,436
kWh
$4,542
139
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,489
Cost:
$4,651
$8,770 83,045 $3,719 114 - - - - - - $8,770
83,045
kWh
$3,719
114
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,888
Cost:
$3,120
$4,191 39,685 $1,697 52 - - - - - - $4,191
39,685
kWh
$1,697
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$292
Cost:
$163
$203 1,921 $89 3 - - - - - - $203
1,921
kWh
$89
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,088
Cost:
$25,965
$33,067 191,549 $3,021 307 - - - - - - $33,067
191,549
kWh
$3,021
307
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,925
Cost:
$3,138
$2,925 27,700 - - - - - - - - $2,925
27,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,765
Cost:
$2,729
$1,180 11,172 $585 18 - - - - - - $1,180
11,172
kWh
$585
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,111
Cost:
$11,016
$6,111 57,871 - - - - - - - - $6,111
57,871
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,093
Cost:
$93,629
$24,183 229,007 $10,299 315 - - $2,321 - $290 - $24,183
229,007
kWh
$10,299
315
kW-months/year
-
-
MMBtu
$2,321
-
$
$290
-
$
TOTAL RECOMMENDED Savings:
$173,620
Cost:
$162,480
$136,505 1,171,067 $23,952 948 $10,552 1,410 $2,321 - $290 - $136,505
1,171,067
kWh
$23,952
948
kW-months/year
$10,552
1,410
MMBtu
$2,321
-
$
$290
-
$
TOTAL IMPLEMENTED Savings:
$133,624
Cost:
$149,980
$96,509 792,313 $23,952 948 $10,552 1,410 $2,321 - $290 - $96,509
792,313
kWh
$23,952
948
kW-months/year
$10,552
1,410
MMBtu
$2,321
-
$
$290
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost