IAC Assessment: SF0535
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2019
Principal Product Metal Parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 10,000
Annual Production 120,000 Units
Production Hrs. Annual 3,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,000 329,310 kWh $0.16
Electricity Demand $20,081 1,320 kW-months/year $15.21
Natural Gas $1,825 141 MMBtu $12.94
TOTAL ENERGY COSTS $74,906
RECOMMENDED SAVINGS* $26,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,332
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,145
Cost:
-
$3,465 21,529 - - $(-1,320) - - - $3,465
21,529
kWh
-
-
kW-months/year
$(-1,320)
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$341
Cost:
$220
$302 1,878 $39 3 - - - - $302
1,878
kWh
$39
3
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,832
Cost:
$7,129
$2,525 15,650 $893 56 $442 - $(-28) - $2,525
15,650
kWh
$893
56
kW-months/year
$442
-
$
$(-28)
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,355
Cost:
$80,550
$17,127 106,420 $3,228 212 - - - - $17,127
106,420
kWh
$3,228
212
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$26,673
Cost:
$87,899
$23,419 145,477 $4,160 271 $(-878) - $(-28) - $23,419
145,477
kWh
$4,160
271
kW-months/year
$(-878)
-
$
$(-28)
-
$
TOTAL IMPLEMENTED Savings:
$26,332
Cost:
$87,679
$23,117 143,599 $4,121 269 $(-878) - $(-28) - $23,117
143,599
kWh
$4,121
269
kW-months/year
$(-878)
-
$
$(-28)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost