IAC logo
IAC Assessment: SF0555
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0555
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2020
Principal Product Specialty Food Products
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 24,498
Annual Production 200,000 Pounds
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,315 1,122,123 kWh $0.18
Electricity Demand $119,796 2,972 kW-months/year $40.31
Electricity Fees $(-87,971) - $ -
Natural Gas $90,417 8,946 MMBtu $10.11
TOTAL ENERGY COSTS $319,557
RECOMMENDED SAVINGS* $572,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,727
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,084
Cost:
-
$6,344 33,604 - - $(-1,260) - $6,344
33,604
kWh
-
-
MMBtu
$(-1,260)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,257
Cost:
$1,080
- - $1,257 125 - - -
-
kWh
$1,257
125
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,734
Cost:
$3,930
$3,734 19,778 - - - - $3,734
19,778
kWh
-
-
MMBtu
-
-
$
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$450,171
Cost:
$750,000
$450,171 249,600 - - - - $450,171
249,600
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,221
Cost:
$33,106
$26,221 133,672 - - - - $26,221
133,672
kWh
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,764
Cost:
$20,616
$7,764 41,121 - - - - $7,764
41,121
kWh
-
-
MMBtu
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$14,667
Cost:
$114,810
$1,524 8,071 $13,143 1,300 - - $1,524
8,071
kWh
$13,143
1,300
MMBtu
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$63,107
Cost:
$268,469
$63,107 334,254 - - - - $63,107
334,254
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$572,005
Cost:
$1,192,011
$558,865 820,100 $14,400 1,425 $(-1,260) - $558,865
820,100
kWh
$14,400
1,425
MMBtu
$(-1,260)
-
$
TOTAL IMPLEMENTED Savings:
$58,727
Cost:
$173,542
$45,587 236,246 $14,400 1,425 $(-1,260) - $45,587
236,246
kWh
$14,400
1,425
MMBtu
$(-1,260)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes