IAC Assessment: SF0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2020
Principal Product Treated Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 74,000
Annual Production 292,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $547,436 4,609,984 kWh $0.12
Electricity Demand $231,815 6,409 kW-months/year $36.17
Natural Gas $8,164 1,118 MMBtu $7.30
TOTAL ENERGY COSTS $787,414
RECOMMENDED SAVINGS* $55,563 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,029
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,636
Cost:
$212
$1,860 15,664 $776 21 - - - - $1,860
15,664
kWh
$776
21
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,557
Cost:
$1,554
$3,557 29,954 - - - - - - $3,557
29,954
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,836
Cost:
$39,572
$14,883 125,326 $10,558 292 $1,083 - $312 - $14,883
125,326
kWh
$10,558
292
kW-months/year
$1,083
-
$
$312
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$474
Cost:
$1,290
$474 3,997 - - - - - - $474
3,997
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,278
Cost:
$23,119
$5,847 49,240 $2,431 67 - - - - $5,847
49,240
kWh
$2,431
67
kW-months/year
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$13,782
Cost:
$57,750
$9,724 81,884 $4,058 112 - - - - $9,724
81,884
kWh
$4,058
112
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,563
Cost:
$123,497
$36,345 306,065 $17,823 492 $1,083 - $312 - $36,345
306,065
kWh
$17,823
492
kW-months/year
$1,083
-
$
$312
-
$
TOTAL IMPLEMENTED Savings:
$33,029
Cost:
$41,338
$20,300 170,944 $11,334 313 $1,083 - $312 - $20,300
170,944
kWh
$11,334
313
kW-months/year
$1,083
-
$
$312
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost