IAC logo
IAC Assessment: SF0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2021
Principal Product Machined Parts for various applications
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 81,500
Annual Production 1,000,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,040 3,270,186 kWh $0.12
Electricity Demand $235,316 7,167 kW-months/year $32.83
Electricity Fees $5,484 - $ -
Natural Gas $8,389 592 MMBtu $14.17
TOTAL ENERGY COSTS $632,229
RECOMMENDED SAVINGS* $83,038 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,977
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20,821
Cost:
-
$20,821 185,406 - - - - - - - - $20,821
185,406
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,911
Cost:
-
$9,511 84,690 - - $(-1,600) - - - - - $9,511
84,690
kWh
-
-
kW-months/year
$(-1,600)
-
$
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,406
Cost:
$3,350
$9,406 83,761 - - - - - - - - $9,406
83,761
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$24,340
Cost:
$29,296
$24,340 216,750 - - - - - - - - $24,340
216,750
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,660
Cost:
$40,195
$8,591 76,497 $6,910 203 $28 - $1,131 - - - $8,591
76,497
kWh
$6,910
203
kW-months/year
$28
-
$
$1,131
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$3,900
Cost:
-
- - - - - - - - $3,900 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$3,900
-
$
TOTAL RECOMMENDED Savings:
$83,038
Cost:
$72,841
$72,669 647,104 $6,910 203 $(-1,572) - $1,131 - $3,900 - $72,669
647,104
kWh
$6,910
203
kW-months/year
$(-1,572)
-
$
$1,131
-
$
$3,900
-
$
TOTAL IMPLEMENTED Savings:
$33,977
Cost:
$43,545
$27,508 244,948 $6,910 203 $(-1,572) - $1,131 - - - $27,508
244,948
kWh
$6,910
203
kW-months/year
$(-1,572)
-
$
$1,131
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost