IAC logo
IAC Assessment: SF0576
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0576
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2021
Principal Product Reclaim Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 10
Plant Area (Sq.Ft.) 660,000
Annual Production 1,825,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $177,192 4,859,948 kWh $0.04
Electricity Demand $91,836 10,308 kW-months/year $8.91
Electricity Fees $20,675 - $ -
Natural Gas $9,905 1,087 MMBtu $9.11
TOTAL ENERGY COSTS $299,608
RECOMMENDED SAVINGS* $259,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,193
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$15,824
Cost:
-
$13,413 201,181 $2,411 276 - - - - - - $13,413
201,181
kWh
$2,411
276
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,886
Cost:
$120
$2,444 36,662 $442 50 - - - - - - $2,444
36,662
kWh
$442
50
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,092
Cost:
$14,612
$10,248 153,644 $1,844 211 - - - - - - $10,248
153,644
kWh
$1,844
211
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,261
Cost:
$17,288
$10,392 155,083 $1,869 214 - - - - - - $10,392
155,083
kWh
$1,869
214
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,882
Cost:
$28,653
$3,831 57,458 $1,654 190 - - $653 - $744 - $3,831
57,458
kWh
$1,654
190
kW-months/year
-
-
MMBtu
$653
-
$
$744
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$41,072
Cost:
$554,541
$9,693 145,381 $16,212 1,853 - - $15,167 - - - $9,693
145,381
kWh
$16,212
1,853
kW-months/year
-
-
MMBtu
$15,167
-
$
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$168,685
Cost:
$1,228,444
$213,419 3,201,120 $38,500 4,400 $(-38,418) (-4,641) $(-44,816) - - - $213,419
3,201,120
kWh
$38,500
4,400
kW-months/year
$(-38,418)
(-4,641)
MMBtu
$(-44,816)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$259,702
Cost:
$1,843,658
$263,440 3,950,529 $62,932 7,194 $(-38,418) (-4,641) $(-28,996) - $744 - $263,440
3,950,529
kWh
$62,932
7,194
kW-months/year
$(-38,418)
(-4,641)
MMBtu
$(-28,996)
-
$
$744
-
$
TOTAL IMPLEMENTED Savings:
$75,193
Cost:
$615,214
$36,608 548,228 $22,021 2,518 - - $15,820 - $744 - $36,608
548,228
kWh
$22,021
2,518
kW-months/year
-
-
MMBtu
$15,820
-
$
$744
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost