Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2021 |
Principal Product | Reclaim Water |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | $10,000,000-$50,000,000 |
# of Employees | 10 |
Plant Area (Sq.Ft.) | 660,000 |
Annual Production | 1,825,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $177,192 | 4,859,948 | kWh | $0.04 |
Electricity Demand | $91,836 | 10,308 | kW-months/year | $8.91 |
Electricity Fees | $20,675 | - | $ | - |
Natural Gas | $9,905 | 1,087 | MMBtu | $9.11 |
TOTAL ENERGY COSTS | $299,608 | |||
RECOMMENDED SAVINGS* | $259,702 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,193 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS |
Savings: $15,824 Cost: - |
$13,413 | 201,181 | $2,411 | 276 | - | - | - | - | - | - |
$13,413 201,181 kWh |
$2,411 276 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,886 Cost: $120 |
$2,444 | 36,662 | $442 | 50 | - | - | - | - | - | - |
$2,444 36,662 kWh |
$442 50 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $12,092 Cost: $14,612 |
$10,248 | 153,644 | $1,844 | 211 | - | - | - | - | - | - |
$10,248 153,644 kWh |
$1,844 211 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,261 Cost: $17,288 |
$10,392 | 155,083 | $1,869 | 214 | - | - | - | - | - | - |
$10,392 155,083 kWh |
$1,869 214 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,882 Cost: $28,653 |
$3,831 | 57,458 | $1,654 | 190 | - | - | $653 | - | $744 | - |
$3,831 57,458 kWh |
$1,654 190 kW-months/year |
- - MMBtu |
$653 - $ |
$744 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $41,072 Cost: $554,541 |
$9,693 | 145,381 | $16,212 | 1,853 | - | - | $15,167 | - | - | - |
$9,693 145,381 kWh |
$16,212 1,853 kW-months/year |
- - MMBtu |
$15,167 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $168,685 Cost: $1,228,444 |
$213,419 | 3,201,120 | $38,500 | 4,400 | $(-38,418) | (-4,641) | $(-44,816) | - | - | - |
$213,419 3,201,120 kWh |
$38,500 4,400 kW-months/year |
$(-38,418) (-4,641) MMBtu |
$(-44,816) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $259,702 Cost: $1,843,658 |
$263,440 | 3,950,529 | $62,932 | 7,194 | $(-38,418) | (-4,641) | $(-28,996) | - | $744 | - | $263,440 3,950,529 kWh |
$62,932 7,194 kW-months/year |
$(-38,418) (-4,641) MMBtu |
$(-28,996) - $ |
$744 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,193 Cost: $615,214 |
$36,608 | 548,228 | $22,021 | 2,518 | - | - | $15,820 | - | $744 | - | $36,608 548,228 kWh |
$22,021 2,518 kW-months/year |
- - MMBtu |
$15,820 - $ |
$744 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |