IAC logo
IAC Assessment: SF0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Plastic products for scientific and medical laboratories
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 110,000
Annual Production 1,500,000,000 Pieces
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,076,035 10,867,035 kWh $0.10
Electricity Demand $161,000 18,288 kW-months/year $8.80
Electricity Fees $12,621 - $ -
TOTAL ENERGY COSTS $1,255,397
RECOMMENDED SAVINGS* $46,401 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,175
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,948
Cost:
$240
$4,411 44,554 $537 61 - - - - $4,411
44,554
kWh
$537
61
kW-months/year
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$10,046
Cost:
$2,379
$10,046 101,473 - - - - - - $10,046
101,473
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,018
Cost:
$13,272
$12,577 127,036 $2,053 233 $720 - $(-1,332) - $12,577
127,036
kWh
$2,053
233
kW-months/year
$720
-
$
$(-1,332)
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,208
Cost:
$6,293
$5,208 52,616 - - - - - - $5,208
52,616
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,181
Cost:
$30,438
$12,181 123,039 - - - - - - $12,181
123,039
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$46,401
Cost:
$52,622
$44,423 448,718 $2,590 294 $720 - $(-1,332) - $44,423
448,718
kWh
$2,590
294
kW-months/year
$720
-
$
$(-1,332)
-
$
TOTAL IMPLEMENTED Savings:
$27,175
Cost:
$33,057
$26,638 269,066 $537 61 - - - - $26,638
269,066
kWh
$537
61
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost