Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2022 |
Principal Product | Secondary Nonferrous Metals |
NAICS | 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 4,000 Tons |
Production Hrs. Annual | 4,176 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,383 | 506,430 | kWh | $0.21 |
Electricity Demand | $42,282 | 2,932 | kW-months/year | $14.42 |
Natural Gas | $200,487 | 18,175 | MMBtu | $11.03 |
TOTAL ENERGY COSTS | $348,152 | |||
RECOMMENDED SAVINGS* | $161,497 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,228 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $9,346 Cost: $2,177 |
$3,311 | 11,767 | - | - | $6,035 | 394 | - | - | - | - |
$3,311 11,767 kWh |
- - kW-months/year |
$6,035 394 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,093 Cost: $4,749 |
$4,045 | 14,376 | $1,048 | 60 | - | - | - | - | - | - |
$4,045 14,376 kWh |
$1,048 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,882 Cost: $13,939 |
$6,447 | 22,909 | $2,116 | 121 | - | - | $402 | - | $(-83) | - |
$6,447 22,909 kWh |
$2,116 121 kW-months/year |
- - MMBtu |
$402 - $ |
$(-83) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,188 Cost: $24,576 |
$8,188 | 28,914 | - | - | - | - | - | - | - | - |
$8,188 28,914 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,260 Cost: $23,959 |
$6,260 | 22,245 | - | - | - | - | - | - | - | - |
$6,260 22,245 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $123,728 Cost: $381,839 |
$123,728 | 439,687 | - | - | - | - | - | - | - | - |
$123,728 439,687 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $161,497 Cost: $451,239 |
$151,979 | 539,898 | $3,164 | 181 | $6,035 | 394 | $402 | - | $(-83) | - | $151,979 539,898 kWh |
$3,164 181 kW-months/year |
$6,035 394 MMBtu |
$402 - $ |
$(-83) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,228 Cost: $16,116 |
$9,758 | 34,676 | $2,116 | 121 | $6,035 | 394 | $402 | - | $(-83) | - | $9,758 34,676 kWh |
$2,116 121 kW-months/year |
$6,035 394 MMBtu |
$402 - $ |
$(-83) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |