IAC Assessment: SF0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Secondary Nonferrous Metals
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 70,000
Annual Production 4,000 Tons
Production Hrs. Annual 4,176
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,383 506,430 kWh $0.21
Electricity Demand $42,282 2,932 kW-months/year $14.42
Natural Gas $200,487 18,175 MMBtu $11.03
TOTAL ENERGY COSTS $348,152
RECOMMENDED SAVINGS* $161,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,228
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$9,346
Cost:
$2,177
$3,311 11,767 - - $6,035 394 - - - - $3,311
11,767
kWh
-
-
kW-months/year
$6,035
394
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,093
Cost:
$4,749
$4,045 14,376 $1,048 60 - - - - - - $4,045
14,376
kWh
$1,048
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,882
Cost:
$13,939
$6,447 22,909 $2,116 121 - - $402 - $(-83) - $6,447
22,909
kWh
$2,116
121
kW-months/year
-
-
MMBtu
$402
-
$
$(-83)
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,188
Cost:
$24,576
$8,188 28,914 - - - - - - - - $8,188
28,914
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,260
Cost:
$23,959
$6,260 22,245 - - - - - - - - $6,260
22,245
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$123,728
Cost:
$381,839
$123,728 439,687 - - - - - - - - $123,728
439,687
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$161,497
Cost:
$451,239
$151,979 539,898 $3,164 181 $6,035 394 $402 - $(-83) - $151,979
539,898
kWh
$3,164
181
kW-months/year
$6,035
394
MMBtu
$402
-
$
$(-83)
-
$
TOTAL IMPLEMENTED Savings:
$18,228
Cost:
$16,116
$9,758 34,676 $2,116 121 $6,035 394 $402 - $(-83) - $9,758
34,676
kWh
$2,116
121
kW-months/year
$6,035
394
MMBtu
$402
-
$
$(-83)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost