IAC logo
IAC Assessment: SF0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Wire and Cable
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 136,000
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $828,478 9,327,830 kWh $0.09
Electricity Demand $391,152 17,316 kW-months/year $22.59
Electricity Fees $17,966 - $ -
Natural Gas $147,294 9,712 MMBtu $15.17
TOTAL ENERGY COSTS $1,384,890
RECOMMENDED SAVINGS* $192,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $192,977
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,887
Cost:
-
$1,887 21,325 - - - - - - $1,887
21,325
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,868
Cost:
-
$11,948 134,544 - - $(-1,080) - - - $11,948
134,544
kWh
-
-
kW-months/year
$(-1,080)
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$38,078
Cost:
$22,361
$38,078 428,802 - - - - - - $38,078
428,802
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,428
Cost:
$26,487
$24,142 271,863 $13,488 598 $869 - $(-71) - $24,142
271,863
kWh
$13,488
598
kW-months/year
$869
-
$
$(-71)
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$35,916
Cost:
$68,135
$35,916 404,465 - - - - - - $35,916
404,465
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,974
Cost:
$4,260
$1,974 22,228 - - - - - - $1,974
22,228
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,736
Cost:
$14,830
$3,736 42,077 - - - - - - $3,736
42,077
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$62,090
Cost:
$317,631
$43,874 494,080 $18,216 806 - - - - $43,874
494,080
kWh
$18,216
806
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$192,977
Cost:
$453,704
$161,555 1,819,384 $31,704 1,404 $(-211) - $(-71) - $161,555
1,819,384
kWh
$31,704
1,404
kW-months/year
$(-211)
-
$
$(-71)
-
$
TOTAL IMPLEMENTED Savings:
$192,977
Cost:
$453,704
$161,555 1,819,384 $31,704 1,404 $(-211) - $(-71) - $161,555
1,819,384
kWh
$31,704
1,404
kW-months/year
$(-211)
-
$
$(-71)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost