IAC Assessment: SF0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Printed Materials
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 73,820
Annual Production 12,000,000 Units
Production Hrs. Annual 4,480
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,570 658,183 kWh $0.15
Electricity Demand $17,395 2,088 kW-months/year $8.33
Natural Gas $14,568 952 MMBtu $15.30
Fuel Oil #2 $11,562 284 MMBtu $40.71
Other Energy $41,424 904 MMBtu $45.82
TOTAL ENERGY COSTS $184,519
RECOMMENDED SAVINGS* $61,951 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,951
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,467
Cost:
-
$2,149 14,203 $318 38 - - - - - - - - $2,149
14,203
kWh
$318
38
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,769
Cost:
$260
$1,499 9,905 $270 32 - - - - - - - - $1,499
9,905
kWh
$270
32
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$9,849
Cost:
$3,482
$2,099 13,871 - - $7,750 507 - - - - - - $2,099
13,871
kWh
-
-
kW-months/year
$7,750
507
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$34,250
Cost:
$35,738
$(-8,538) (-56,432) - - - - $41,222 902 $1,566 - - - $(-8,538)
(-56,432)
kWh
-
-
kW-months/year
-
-
MMBtu
$41,222
902
MMBtu
$1,566
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,067
Cost:
$1,675
$744 4,916 $172 21 - - - - $167 - $(-16) - $744
4,916
kWh
$172
21
kW-months/year
-
-
MMBtu
-
-
MMBtu
$167
-
$
$(-16)
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$12,549
Cost:
$55,774
$12,549 82,942 - - - - - - - - - - $12,549
82,942
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$61,951
Cost:
$96,929
$10,502 69,405 $760 91 $7,750 507 $41,222 902 $1,733 - $(-16) - $10,502
69,405
kWh
$760
91
kW-months/year
$7,750
507
MMBtu
$41,222
902
MMBtu
$1,733
-
$
$(-16)
-
$
TOTAL IMPLEMENTED Savings:
$61,951
Cost:
$96,929
$10,502 69,405 $760 91 $7,750 507 $41,222 902 $1,733 - $(-16) - $10,502
69,405
kWh
$760
91
kW-months/year
$7,750
507
MMBtu
$41,222
902
MMBtu
$1,733
-
$
$(-16)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Energy Personnel Changes Ancillary Material Cost