IAC logo
IAC Assessment: SF0595
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0595
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Baked Bread and Buns
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 175,000
Annual Production 72,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $527,456 6,794,828 kWh $0.08
Electricity Demand $233,694 13,140 kW-months/year $17.78
Natural Gas $752,516 52,297 MMBtu $14.39
TOTAL ENERGY COSTS $1,513,666
RECOMMENDED SAVINGS* $73,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,721
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,809
Cost:
$1,487
$859 11,073 - - $4,950 344 - - - - $859
11,073
kWh
-
-
kW-months/year
$4,950
344
MMBtu
-
-
$
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,174
Cost:
$1,800
- - - - $2,174 151 - - - - -
-
kWh
-
-
kW-months/year
$2,174
151
MMBtu
-
-
$
-
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$9,134
Cost:
$7,644
$9,134 117,704 - - - - - - - - $9,134
117,704
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$37,173
Cost:
$32,818
- - - - $37,173 2,583 - - - - -
-
kWh
-
-
kW-months/year
$37,173
2,583
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,989
Cost:
$21,654
$9,459 121,894 $5,192 292 - - $460 - $(-122) - $9,459
121,894
kWh
$5,192
292
kW-months/year
-
-
MMBtu
$460
-
$
$(-122)
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,280
Cost:
$7,191
$2,280 29,385 - - - - - - - - $2,280
29,385
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,469
Cost:
$5,620
$1,469 18,932 - - - - - - - - $1,469
18,932
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,028
Cost:
$78,214
$23,201 298,988 $5,192 292 $44,297 3,078 $460 - $(-122) - $23,201
298,988
kWh
$5,192
292
kW-months/year
$44,297
3,078
MMBtu
$460
-
$
$(-122)
-
$
TOTAL IMPLEMENTED Savings:
$26,721
Cost:
$37,752
$14,067 181,284 $5,192 292 $7,124 495 $460 - $(-122) - $14,067
181,284
kWh
$5,192
292
kW-months/year
$7,124
495
MMBtu
$460
-
$
$(-122)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product