IAC logo
IAC Assessment: SF0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Secondary Treated Water & Title 22 Recycled Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 330,000
Annual Production 730,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $527,256 2,524,260 kWh $0.21
Electricity Demand $65,223 3,859 kW-months/year $16.90
TOTAL ENERGY COSTS $592,479
RECOMMENDED SAVINGS* $195,812 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,702
Cost:
-
$7,840 37,536 $862 51 - - $7,840
37,536
kWh
$862
51
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$49,633
Cost:
$13,122
$44,685 213,925 $4,948 293 - - $44,685
213,925
kWh
$4,948
293
kW-months/year
-
-
$
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$81,680
Cost:
$219,094
$69,380 332,154 $13,948 825 $(-1,648) - $69,380
332,154
kWh
$13,948
825
kW-months/year
$(-1,648)
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,031
Cost:
$15,452
$3,031 14,509 - - - - $3,031
14,509
kWh
-
-
kW-months/year
-
-
$
05: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$52,766
Cost:
$303,600
$52,766 252,616 - - - - $52,766
252,616
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$195,812
Cost:
$551,268
$177,702 850,740 $19,758 1,169 $(-1,648) - $177,702
850,740
kWh
$19,758
1,169
kW-months/year
$(-1,648)
-
$
TOTAL IMPLEMENTED Savings:
$61,366
Cost:
$28,574
$55,556 265,970 $5,810 344 - - $55,556
265,970
kWh
$5,810
344
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes