IAC logo
IAC Assessment: SF0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2023
Principal Product Surgical and Medical Instruments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 350,000
Annual Production 23,500 Units
Production Hrs. Annual 3,432
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $940,470 6,410,892 kWh $0.15
Electricity Demand $571,524 14,151 kW-months/year $40.39
Electricity Fees $6,299 - $ -
Natural Gas $365,857 22,005 MMBtu $16.63
TOTAL ENERGY COSTS $1,884,150
RECOMMENDED SAVINGS* $129,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$33,778
Cost:
$1,120
$24,521 167,151 $9,257 229 - - $24,521
167,151
kWh
$9,257
229
kW-months/year
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$21,457
Cost:
$280
$16,165 110,188 - - $5,292 318 $16,165
110,188
kWh
-
-
kW-months/year
$5,292
318
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,745
Cost:
$1,883
$4,745 32,348 - - - - $4,745
32,348
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$65,157
Cost:
$47,904
$65,157 444,152 - - - - $65,157
444,152
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,264
Cost:
$2,879
$1,264 8,614 - - - - $1,264
8,614
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,142
Cost:
$8,611
$2,285 15,575 $857 21 - - $2,285
15,575
kWh
$857
21
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$129,543
Cost:
$62,677
$114,137 778,028 $10,114 250 $5,292 318 $114,137
778,028
kWh
$10,114
250
kW-months/year
$5,292
318
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas