IAC logo
IAC Assessment: SF0620
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0620
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2024
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 1,600,000
Annual Production 5,110,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,541,562 6,803,344 kWh $0.23
Electricity Demand $535,088 12,010 kW-months/year $44.55
Electricity Fees $13,544 - $ -
Natural Gas $62,561 3,507 MMBtu $17.84
Other Gas $1 53,340 MMBtu $0.00
TOTAL ENERGY COSTS $2,152,756
RECOMMENDED SAVINGS* $2,615,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$101,612
Cost:
$3,840
$80,068 353,344 $21,544 484 - - - - - - $80,068
353,344
kWh
$21,544
484
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,113
Cost:
$24,553
$15,860 66,991 $7,831 176 - - $15,880 - $(-458) - $15,860
66,991
kWh
$7,831
176
kW-months/year
-
-
$
$15,880
-
$
$(-458)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$81,460
Cost:
$95,723
$64,192 283,284 $17,268 388 - - - - - - $64,192
283,284
kWh
$17,268
388
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$11,663
Cost:
$52,983
$9,204 40,619 $2,459 55 - - - - - - $9,204
40,619
kWh
$2,459
55
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$83,597
Cost:
$429,096
$60,856 268,562 $34,161 767 - - $8,409 - $(-19,829) - $60,856
268,562
kWh
$34,161
767
kW-months/year
-
-
$
$8,409
-
$
$(-19,829)
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,786,404
Cost:
$4,187,700
$1,541,638 6,803,343 - - $420,507 - $(-175,741) - - - $1,541,638
6,803,343
kWh
-
-
kW-months/year
$420,507
-
$
$(-175,741)
-
$
-
-
$
07: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$511,502
Cost:
$6,765,825
- - $511,502 11,482 - - - - - - -
-
kWh
$511,502
11,482
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,615,351
Cost:
$11,559,720
$1,771,818 7,816,143 $594,765 13,351 $420,507 - $(-151,452) - $(-20,287) - $1,771,818
7,816,143
kWh
$594,765
13,351
kW-months/year
$420,507
-
$
$(-151,452)
-
$
$(-20,287)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost