Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2024 |
Principal Product | Metal Cans |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $50,000,000-$100,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 218,000 |
Annual Production | 450,000,000 Pieces |
Production Hrs. Annual | 6,624 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,084,379 | 9,445,657 | kWh | $0.11 |
Electricity Demand | $189,262 | 27,758 | kW-months/year | $6.82 |
Electricity Fees | $87,514 | - | $ | - |
Natural Gas | $512,201 | 36,036 | MMBtu | $14.21 |
TOTAL ENERGY COSTS | $1,873,356 | |||
RECOMMENDED SAVINGS* | $73,636 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,659 Cost: - |
$7,299 | 58,821 | - | - | $(-640) | - | - | - |
$7,299 58,821 kWh |
- - kW-months/year |
$(-640) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,433 Cost: $730 |
$2,433 | 19,608 | - | - | - | - | - | - |
$2,433 19,608 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,097 Cost: $12,467 |
$11,691 | 94,207 | $1,164 | 171 | $(-1,197) | - | $439 | - |
$11,691 94,207 kWh |
$1,164 171 kW-months/year |
$(-1,197) - $ |
$439 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,663 Cost: $34,431 |
$10,663 | 85,919 | - | - | - | - | - | - |
$10,663 85,919 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $28,508 Cost: $135,731 |
$28,508 | 229,720 | - | - | - | - | - | - |
$28,508 229,720 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $13,276 Cost: $95,533 |
$13,276 | 106,980 | - | - | - | - | - | - |
$13,276 106,980 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,636 Cost: $278,892 |
$73,870 | 595,255 | $1,164 | 171 | $(-1,837) | - | $439 | - | $73,870 595,255 kWh |
$1,164 171 kW-months/year |
$(-1,837) - $ |
$439 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes |