IAC logo
IAC Assessment: SF0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2024
Principal Product Synthetic Peptides
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 50,000
Annual Production 12,000,000 Units
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,319 659,977 kWh $0.16
Electricity Demand $51,128 1,399 kW-months/year $36.55
Natural Gas $32,672 1,670 MMBtu $19.56
TOTAL ENERGY COSTS $186,119
RECOMMENDED SAVINGS* $16,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,288
Cost:
-
$4,288 27,660 - - - - - - - - $4,288
27,660
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$4,851
Cost:
-
$2,268 14,632 - - $2,583 132 - - - - $2,268
14,632
kWh
-
-
kW-months/year
$2,583
132
MMBtu
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,887
Cost:
$1,146
$2,887 18,623 - - - - - - - - $2,887
18,623
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,599
Cost:
$3,962
$1,292 8,332 $1,205 33 - - $110 - $(-8) - $1,292
8,332
kWh
$1,205
33
kW-months/year
-
-
MMBtu
$110
-
$
$(-8)
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,720
Cost:
$4,257
$1,720 11,097 - - - - - - - - $1,720
11,097
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,345
Cost:
$9,365
$12,455 80,344 $1,205 33 $2,583 132 $110 - $(-8) - $12,455
80,344
kWh
$1,205
33
kW-months/year
$2,583
132
MMBtu
$110
-
$
$(-8)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product