Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2024 |
Principal Product | Fish |
NAICS | 311710 - Seafood Product Preparation and Packaging |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $10,000,000-$50,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 15,000,000 Pounds |
Production Hrs. Annual | 2,496 |
Location (State) | HI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $255,689 | 771,345 | kWh | $0.33 |
Electricity Demand | $25,314 | 1,870 | kW-months/year | $13.54 |
TOTAL ENERGY COSTS | $281,003 | |||
RECOMMENDED SAVINGS* | $149,158 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,235 Cost: - |
$4,235 | 12,775 | - | - | - | - | - | - |
$4,235 12,775 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,992 Cost: - |
$3,992 | 12,041 | - | - | - | - | - | - |
$3,992 12,041 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $425 Cost: $140 |
$355 | 1,070 | $70 | 5 | - | - | - | - |
$355 1,070 kWh |
$70 5 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $20,979 Cost: $27,525 |
$19,923 | 60,100 | $1,056 | 78 | - | - | - | - |
$19,923 60,100 kWh |
$1,056 78 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2626 AVOID FROST FORMATION ON EVAPORATORS |
Savings: $10,643 Cost: $13,568 |
$2,519 | 7,600 | $8,124 | 600 | - | - | - | - |
$2,519 7,600 kWh |
$8,124 600 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,227 Cost: $12,256 |
$7,114 | 21,461 | $1,173 | 87 | $170 | - | $(-230) | - |
$7,114 21,461 kWh |
$1,173 87 kW-months/year |
$170 - $ |
$(-230) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,248 Cost: $52,290 |
$19,248 | 58,064 | - | - | - | - | - | - |
$19,248 58,064 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $166 Cost: $750 |
$166 | 501 | - | - | - | - | - | - |
$166 501 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $81,243 Cost: $249,045 |
$81,243 | 245,078 | - | - | - | - | - | - |
$81,243 245,078 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $149,158 Cost: $355,574 |
$138,795 | 418,690 | $10,423 | 770 | $170 | - | $(-230) | - | $138,795 418,690 kWh |
$10,423 770 kW-months/year |
$170 - $ |
$(-230) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material |