IAC Assessment: SF0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2024
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 80,000
Annual Production 60,000 Units
Production Hrs. Annual 2,860
Location (State) HI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $407,439 1,157,511 kWh $0.35
Electricity Demand $129,426 5,178 kW-months/year $25.00
LPG $367,834 9,058 MMBtu $40.61
TOTAL ENERGY COSTS $982,834
RECOMMENDED SAVINGS* $517,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Water Usage Water Disposal Personnel Changes By-product Production Electricity Usage Electricity Demand Electricity Fees LPG Water Usage Water Disposal Personnel Changes By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,292
Cost:
-
$8,732 24,808 - - - - - - - - - - $(-1,440) - - - $8,732
24,808
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-1,440)
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,331
Cost:
-
- - - - - - $3,411 84 - - - - $(-1,080) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,411
84
MMBtu
-
-
Tgal
-
-
Tgal
$(-1,080)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,552
Cost:
$140
$4,147 11,780 $405 16 - - - - - - - - - - - - $4,147
11,780
kWh
$405
16
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,465
Cost:
$650
$17,465 49,617 - - - - - - - - - - - - - - $17,465
49,617
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$828
Cost:
$98
- - - - - - $828 20 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$828
20
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$772
Cost:
$338
- - - - - - $772 19 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$772
19
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$56,762
Cost:
$75,338
$19,237 54,651 - - - - $32,886 810 $2,277 343 $2,362 343 - - - - $19,237
54,651
kWh
-
-
kW-months/year
-
-
$
$32,886
810
MMBtu
$2,277
343
Tgal
$2,362
343
Tgal
-
-
$
-
-
$
08: 2.2123 INSULATE FEEDWATER TANK Savings:
$31,296
Cost:
$45,008
- - - - - - $24,163 595 $3,501 528 $3,632 528 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$24,163
595
MMBtu
$3,501
528
Tgal
$3,632
528
Tgal
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,796
Cost:
$17,995
$6,796 19,306 - - - - - - - - - - - - - - $6,796
19,306
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
10: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$23,270
Cost:
$67,410
- - - - - - $23,270 573 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,270
573
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
11: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$758
Cost:
$3,995
- - - - - - $585 14 $85 13 $88 13 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$585
14
MMBtu
$85
13
Tgal
$88
13
Tgal
-
-
$
-
-
$
12: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$364,913
Cost:
$422,153
$407,444 1,157,511 - - $(-94,064) - - - - - - - $(-53,837) - $105,370 - $407,444
1,157,511
kWh
-
-
kW-months/year
$(-94,064)
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-53,837)
-
$
$105,370
-
$
TOTAL RECOMMENDED Savings:
$517,035
Cost:
$633,125
$463,821 1,317,673 $405 16 $(-94,064) - $85,915 2,116 $5,863 884 $6,082 884 $(-56,357) - $105,370 - $463,821
1,317,673
kWh
$405
16
kW-months/year
$(-94,064)
-
$
$85,915
2,116
MMBtu
$5,863
884
Tgal
$6,082
884
Tgal
$(-56,357)
-
$
$105,370
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ Tgal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees LPG Water Usage Water Disposal Personnel Changes By-product Production Electricity Usage Electricity Demand Electricity Fees LPG Water Usage Water Disposal Personnel Changes By-product Production