IAC Assessment: SF0632
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0632
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2025
Principal Product Precision Airflow Measurement Devices
NAICS 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 40,900
Annual Production 7,500 Units
Production Hrs. Annual 3,155
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,090 200,206 kWh $0.30
Electricity Demand $17,743 868 kW-months/year $20.45
Natural Gas $11,585 546 MMBtu $21.22
TOTAL ENERGY COSTS $88,418
RECOMMENDED SAVINGS* $19,747 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,457
Cost:
-
$3,457 15,997 - - - - - - $3,457
15,997
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$723
Cost:
-
$723 2,450 - - - - - - $723
2,450
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$173
Cost:
$158
$136 462 $37 2 - - - - $136
462
kWh
$37
2
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,394
Cost:
$12,341
$11,623 39,385 $3,485 170 $356 - $(-70) - $11,623
39,385
kWh
$3,485
170
kW-months/year
$356
-
$
$(-70)
-
$
TOTAL RECOMMENDED Savings:
$19,747
Cost:
$12,499
$15,939 58,294 $3,522 172 $356 - $(-70) - $15,939
58,294
kWh
$3,522
172
kW-months/year
$356
-
$
$(-70)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material