IAC Assessment: SF0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2025
Principal Product Tempered Glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 100,000
Annual Production 13,200,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,189,189 7,881,360 kWh $0.15
Electricity Demand $1,452,723 25,898 kW-months/year $56.09
Natural Gas $1,097 45 MMBtu $24.54
TOTAL ENERGY COSTS $2,643,009
RECOMMENDED SAVINGS* $128,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,190
Cost:
-
$7,150 47,380 - - - - $(-960) - - - $7,150
47,380
kWh
-
-
kW-months/year
-
-
$
$(-960)
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,091
Cost:
-
$6,467 42,855 $4,624 82 - - - - - - $6,467
42,855
kWh
$4,624
82
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$25,314
Cost:
$6,300
$25,314 167,753 - - - - - - - - $25,314
167,753
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$55,964
Cost:
$17,866
$55,964 370,871 - - - - - - - - $55,964
370,871
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,706
Cost:
$2,070
- - - - $3,706 - - - - - -
-
kWh
-
-
kW-months/year
$3,706
-
$
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,362
Cost:
$8,453
$5,458 36,172 $3,904 70 - - - - - - $5,458
36,172
kWh
$3,904
70
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,856
Cost:
$6,881
$6,856 45,492 - - - - - - - - $6,856
45,492
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$9,559
Cost:
$18,756
$5,588 37,032 $3,971 71 - - - - - - $5,588
37,032
kWh
$3,971
71
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$585
Cost:
$1,248
$509 3,374 - - - - $24 - $52 - $509
3,374
kWh
-
-
kW-months/year
-
-
$
$24
-
$
$52
-
$
TOTAL RECOMMENDED Savings:
$128,627
Cost:
$61,574
$113,306 750,929 $12,499 223 $3,706 - $(-936) - $52 - $113,306
750,929
kWh
$12,499
223
kW-months/year
$3,706
-
$
$(-936)
-
$
$52
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material