IAC Assessment: SF0638
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0638
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2025
Principal Product Fabricated Steel
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 68,200
Annual Production 4,800 Tons
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,338 194,989 kWh $0.55
LPG $20,967 695 MMBtu $30.16
TOTAL ENERGY COSTS $128,305
RECOMMENDED SAVINGS* $83,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage LPG Personnel Changes Primary Raw Material Electricity Usage LPG Personnel Changes Primary Raw Material
$ kWh $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,654
Cost:
$41
$1,654 3,004 - - - - - - $1,654
3,004
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,021
Cost:
-
$12,677 23,026 - - $(-656) - - - $12,677
23,026
kWh
-
-
MMBtu
$(-656)
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,768
Cost:
$2,490
$2,989 5,429 $1,779 59 - - - - $2,989
5,429
kWh
$1,779
59
MMBtu
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,692
Cost:
$25,000
$11,692 21,239 - - - - - - $11,692
21,239
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,578
Cost:
$13,681
$6,516 11,835 - - $27 - $35 - $6,516
11,835
kWh
-
-
MMBtu
$27
-
$
$35
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$46,637
Cost:
$70,731
$46,637 84,717 - - - - - - $46,637
84,717
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$83,350
Cost:
$111,943
$82,165 149,250 $1,779 59 $(-629) - $35 - $82,165
149,250
kWh
$1,779
59
MMBtu
$(-629)
-
$
$35
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage LPG Personnel Changes Primary Raw Material Electricity Usage LPG Personnel Changes Primary Raw Material